Subansiri Lower Hydroelectric Project (SLHEP)

Source:  DH Subject:  Mapping Context:  India’s largest hydropower project, the 2,000 MW Subansiri Lower Hydroelectric Project, has become operational after nearly 20 years, with the commissioning of its first 250 MW unit. About Subansiri Lower Hydroelectric Project (SLHEP): What it is? The Subansiri Lower Hydroelectric Project is a run-of-the-river hydropower project with an installed capacity …

Subansiri Lower Hydroelectric Project

Mapping Source: IE Context: The Subansiri Lower Hydroelectric Project faced a setback when a landslide blocked the only functional diversion tunnel and stopped the flow of water downstream of the dam into the Subansiri River, a major tributary of the Brahmaputra About Subansiri Lower Hydroelectric Project It is a run-of-river dam that aims to generate 2,000 MW of power by harnessing the potential of …