Context: The proposed ₹113,000 crore Siang Upper Multipurpose Project (SUMP) remains locked in a tense standoff with local indigenous Adi and Galo tribes in Arunachal Pradesh over displacement concerns and a deep trust deficit.

About Siang Upper Multipurpose Project:
What It Is?
- The Siang Upper Multipurpose Project (SUMP) is a planned mega-hydroelectric and flood-control facility designed with an installed capacity of 11,000 MW to 11,200 MW.
- It consolidates two earlier proposals into a single, massive storage-type reservoir with an estimated height of 280–300 meters, engineered to generate 47 billion kWh of electricity annually and hold a massive 9-billion-cubic-meter reservoir volume.
Location and Rivers Involved:
- Location: Planned near Geku village in the Upper Siang district of Arunachal Pradesh, India.
- Primary River: The Siang River, which enters India near Gelling. Upstream in Tibet, the river is known as the Yarlung Tsangpo (originating at an elevation of 5,300 meters in the Chemayungdung mountain range near Mansarovar).
- Basin Confluences: The Siang flows 197 km to its confluence with its largest right-bank tributary, the Shiyomi River, before joining the Dibang and Lohit downstream in Assam to form the mighty Brahmaputra River.
- The basin is also fed by the high-altitude Yar Gyap Chu stream flowing through the Mechuka Valley.
Current Status:
- The project is currently stalled.
- Intense grassroots protests led by the Siang Indigenous Farmer’s Forum (SIFF) and the Adi Banne Kebang (ABK) have blocked the executing agency, NHPC, from conducting essential pre-feasibility surveys.
- On-the-ground resistance covers three proposed coordinates—Ugeng, Dite Dime, and Parong—leaving the exact scope of village submergence and displacement highly contested.
Key Features:
- Deep Canyon Topography: The Siang flows through the Yarlung Tsangpo Grand Canyon, creating steep, fast-flowing gorges that provide immense hydropower potential but remain ecologically fragile.
- Fragile Seismotectonic Zone: The basin lies in the earthquake-prone eastern Himalayas, where landslides and seismic activity can trigger natural dams and sudden downstream floods.
- Alluvial Valleys and Agriculture: Downstream alluvial plains are rich in fertile sediments, supporting the region’s orchard economy with crops like kiwi, mandarin oranges, and large cardamom.
- Volatile Monsoonal Hydrology: Heavy monsoon rainfall causes sharp seasonal flow variations, leading to floods, riverbank erosion, and loss of fertile agricultural land.
Significance:
- Developing infrastructure on the Siang strengthens India’s prior-use claims under international water law, reinforcing its position in transboundary river management.
- The proposed reservoir can absorb sudden flood surges or upstream water releases, reducing flood risks for Arunachal Pradesh and Assam.
- The project can generate clean hydropower, improve irrigation, create employment, and transform Arunachal Pradesh into a major green energy hub.








