India commissioned its first indigenously developed 1 MW green hydrogen plant

Source:  TOI

Context: India commissioned its first indigenously developed 1 MW green hydrogen plant at Deendayal Port, Kandla — a milestone under the National Green Hydrogen Mission and Maritime India Vision 2030.

About India commissioned its first indigenously developed 1 MW green hydrogen plant:

What it is?

  • A 1-megawatt green hydrogen facility, part of a planned 10 MW project to support India’s clean maritime operations.
  • Located at Deendayal Port Authority (DPA), Kandla, Gujarat — the first such facility at an Indian port.

Developed By:

  • Fully Make-in-India initiative led by Indian engineers.
  • Executed by DPA in collaboration with engineering partner Larsen & Toubro (L&T).

Technology Used:

  • Uses indigenously manufactured electrolyzers to produce green hydrogen via electrolysis using renewable energy sources.
  • Demonstrates indigenous capacity for complex clean energy systems.

Aim:

  • To support India’s Net Zero goals and transition to clean fuel in maritime transport.
  • Aligns with National Green Hydrogen Mission (2023) and Maritime India Vision 2030.

Key Features:

  1. Fast Execution: Constructed within 4 months — a model for speed, scale, and skill.
  2. Capacity: Will produce ~140 metric tonnes of green hydrogen annually.
  3. Phase-wise Expansion: First phase (1 MW) commissioned and 5 MW to be added by FY-end, full 10 MW by mid-next fiscal.
  4. Pilot Use: Powers 11 hydrogen buses and port street lighting initially.
  5. Scalable Model: Aims to run entire port operations on green hydrogen in future.

Significance: