Biomass pellets

GS Paper 3

 Syllabus: Conservation and pollution-related issues

 

Source: DTE

 Context: The Central Pollution Control Board (CPCB) revised the financial grants for biomass pellet manufacturing units.

 

What are Biomass pellets?

Meaning These are a type of solid fuel made from compressed organic material (biomass) such as industrial waste and co-products, food waste, agricultural residues, energy crops, and untreated lumber.
Types These are of two kinds – torrefied (Biomass processed at 250-350°C in the absence of oxygen) and non-torrefied pellets (biomass is shredded, ground and sent to a pellet reactor, where it is compressed and bonded).
Advantages Pellets are extremely dense and can be produced with a low moisture content (below 10%) which allows them to be burned with a very high combustion efficiency.

 

Emissions such as NOx, SOx and volatile organic compounds from pellet burning equipment are in general very low.

Disadvantages A recognized problem is the emission of fine particulate matter into the air.

 

The capital expenditure for setting up a pellet manufacturing unit entails variables such as land, machinery, air pollution control devices, factory infrastructures such as sheds and offices, etc.

Potential Pelletised biomass can potentially produce 6% of India’s total electricity in 2030/31, in addition to direct biomass co-firing for electricity production.

 

Biomass pellets production/usage in India:

  • It is mandatory to use biomass or agricultural residue (5-10%) as combustion fuel along with coal in coal-fired thermal power plants.
  • The biomass used for co-combustion in the power plants is processed and refined into pellets with a calorific value comparable to coal.

 

CPCB decision:

  • Increased the budget for manufacturing non-torrefied biomass pellets to 28 lakhs (from 14 lakhs) per tonne per hour (TPH) of production capacity/40% of the capital cost of the plant and machinery – whichever is lower.
  • In the case of manufacturing torrefied biomass, no changes are introduced in the fund allocation (of Rs 28 lakhs per TPH) in the revised CPCB guidelines.

 

Concerns:

  • These allocations are grossly insufficient to meet the current requirements of the pellet manufacturing industry.
    • The cost of machinery with a production capacity of one TPH is approximately Rs 1 crore and the grants would cover only 28% of the capital investment.
  • This gross underestimation will not help close the existing demand-supply gap as the country has limited pellet manufacturers.

 

Way ahead:

  • An imminent need to escalate the biomass pellet manufacturing capacity in the country.
  • Indira Gandhi Super Thermal Power Project of NTPC in Jhajjar, Haryana has taken steps towards facilitating the establishment of pellet manufacturing units.
    • More such initiatives need to be taken by the power generators and the government.
  • All the actors in the supply chain, starting from the farmers and aggregators to pellet manufacturers, must be incentivised.

 

Insta Links:

National Mission on use of Biomass in coal based thermal power plants