Mekedatu issue:

GS Paper 2:

Topics Covered: Government policies and interventions for development in various sectors and issues arising out of their design and implementation.

 

Context:

Tamil Nadu has rejected the idea for an exclusive discussion by the Cauvery Water Management Authority (CWMA) on the Mekedatu Balancing Reservoir-cum-Drinking Water Project proposed by Karnataka.

  • Tamil Nadu reiterated its position that there should be no discussion on the subject, which was sub judice.

 

What’s the issue? Why is the project delayed?

Tamil Nadu has protested against Karnataka’s move to build a reservoir on river Cauvery at Mekedatu. It is “not acceptable” to the state that Karnataka wants to utilise 4.75 tmc as drinking water from a reservoir with a storage capacity of 67tmc ft.

  • However, the Karnataka Government has asserted that there is no “compromise” on the Mekedatu project and the state wants to undertake the project.

 

Current Affairs

 

Water sharing between Karnataka and Tamil Nadu:

Karnataka is supposed to release Cauvery water from three sources:

  1. One being the water flowing in the areas downstream River Kabini, catchment areas of Krishnarajasagar reservoir, the sub-basins of Shimsha, Arkavathi, and Suvarnavathi rivers, and the water from minor rivers.
  2. Secondly, water is released from Kabini dam.
  3. The third source is water that is released from Krishnarajasagar dam.

In the case of the second and third sources, which are under the control of Karnataka, water is released to TN only after storing sufficient water for their use.

  • Since there is no dam in the first source, water from these areas have been freely flowing into TN without a hitch.
  • But now, TN state government felt that Karnataka was “conspiring” to block this source as well through the Mekedatu dam.
  • Mekedatu zone represented the last free point from where Cauvery water flowed unrestricted into the downstream state of TN from the upstream Karnataka.

 

Current Affairs

 

About the Project:

  • Mekedatu is a multipurpose (drinking and power) project.
  • It involves building a balancing reservoir, near Kanakapura in Ramanagara district in Karnataka.
  • The project once completed is aimed at ensuring drinking water to Bengaluru and neighboring areas (4.75 TMC) and also can generate 400 MW power.
  • The estimated cost of the project is Rs 9,000 crore.

 

Current Affairs

 

Why is Tamil Nadu against this project?

  1. It says, the CWDT and the SC have found that the existing storage facilities available in the Cauvery basin were adequate for storing and distributing water so Karnataka’s proposal is ex-facie (on the face of it) untenable and should be rejected outright.
  2. It has also held that the reservoir is not just for drinking water alone, but to increase the extent of irrigation, which is in clear violation of the Cauvery Water Disputes Award.

 

Award by the tribunal and the Supreme Court:

The tribunal was set up in 1990 and made its final award in 2007, granting 419 tmcft of water to Tamil Nadu, 270 tmcft to Karnataka, 30 tmcft to Kerala and 7 tmcft to Puducherry. The tribunal ordered that in rain-scarcity years, the allocation for all would stand reduced.

However, both Tamil Nadu and Karnataka expressed unhappiness over the allocation and there were protests and violence in both states over water-sharing. That saw the Supreme Court take up the matter and, in a 2018 judgment, it apportioned 14.75 tmcft from Tamil Nadu’s earlier share to Karnataka.

  • The new allocation thus stood at 404.25 tmcft for Tamil Nadu while Karnataka’s share went up to 284.75 tmcft. The share for Kerala and Puducherry remained unchanged.

 

Current Affairs

 

What’s the way out then?

The Centre has said the project required the approval of the Cauvery Water Management Authority’s (CWMA).

  • The Detail Project Report (DPR) sent by Karnataka was tabled in the CWMA several times for approval, but the discussion on this issue could not take place due to a lack of consensus among party states Karnataka and Tamil Nadu.

Also, as per the Cauvery Water Dispute Tribunal‘s final award, which was modified by the Supreme Court, acceptance of CWMA would be a prerequisite for consideration of the DPR by the Jal Shakti Ministry.

Since the project was proposed across an inter-state river, it required approval of lower riparian state(s) as per the interstate water dispute act.

 

Insta Curious:

Do you know about the Cauvery Management Scheme? What are the components of the scheme? Reference

 

InstaLinks:

Prelims Link:

  1. Tributaries of Cauvery.
  2. Basin states.
  3. Important falls and dams across the river.
  4. Where is Mekedatu?
  5. What is the project related to?
  6. Beneficiaries of the project.

Mains Link:

Write a note on the Mekedatu project.